From the 15th November 2021 work will commence on the ventilation system at Titanic Mill.

This work will initially focus on the 3rd floor, with other floors to be addressed subsequently. The work is expected to take a substantial length of time, as each floor must be worked on separately. As such, we are unable to provide a definite completion date.

During this time, there will be some disruption in the communal corridors. We apologise for any inconvenience, and we hope residents will appreciate that the work will ultimately benefit everyone.

As the engineers have previously been unable to access all apartments simultaneously, as required to carry out the full balancing of the system, the work now instructed is a more limited version of the balancing. We hope that this will go some way towards addressing at least a proportion of the issues experienced by residents with the heating and cooling of their apartments.